Gallery

Gallery

Work in progress and handed over, photographed on site.

Photo and video

Site highlights

Uttara North to Agargaon stretch MRT Line-6 corridor Work along the Uttara North to Agargaon stretch, beside live traffic.
Uttara North to Agargaon stretch Station platforms Platform works at the elevated stations.
Uttara North to Agargaon stretch Below the viaduct Footpaths and railings on the street below the line.
Kamalapur Station Kamalapur Station Works inside the southern terminus of Line-6.
Uttara North to Agargaon stretch Night works window Work scheduled into agreed low-traffic windows.
PWD Bhaban renovation PWD Bhaban renovation Renovation works at Segunbagicha, with the offices in use.
Area handback inspection Each zone inspected and signed off before the next one opens.

Select any photograph to view it full size.

Kamalapur Station Glazing going in at Kamalapur Station S17, the MRT Line-6 terminus, while the station stays open and guarded.
Uttara North to Agargaon stretch Viaduct railing installed beside moving traffic on the Line-6 corridor between Uttara and Agargaon.
Uttara North to Agargaon stretch Footpath reinstated and handed back in use before the next length is opened up.
PWD Bhaban renovation PWD Bhaban in Segunbagicha, renovated for the Public Works Department without closing the building for a day.
Uttara North to Agargaon stretch Rain protection canopy at an operating station, erected inside access windows agreed with the site team.
Crews inducted and in full personal protective equipment before entering a live work zone.
Kamalapur Station Skylight glazing seen from below, fixed to approved shop drawings after site measurement.
Uttara North to Agargaon stretch Lifting scheduled into an agreed night window, so station operations carry on uninterrupted.
PWD Bhaban renovation Each completed area inspected and signed off by the engineer before it returns to public use.
Start a conversation

Want to see a package like these?

We can walk you through the method, the submissions and the handover records behind any of these photographs.

  • Site visits arranged on request
  • Method statements and records available
  • Reply within the hour on working days