Dhaka Metro station platform under its arched roof

We build where
the city is watching

A full civil and architectural works solution, delivered on the projects Bangladesh watches most closely, starting with MRT Line-6.

  • MRT Line-6 subcontractor of record
  • Works for the Public Works Department
  • e-GP enlisted
DMTCL ITD e-GP LGED PWD BADC Saint-Gobain Nasir Float Glass Dhakathai McDonald Steel
Flagship programme · DMTCL · MRT Line-6

On the corridor the whole country watches

Dhaka Mass Transit Company Limited owns MRT Line-6, the country's first metro. We are subcontractor of record under Italian-Thai Development on two packages: on the platforms and the street below from Uttara North to Agargaon, and inside Kamalapur Station at the southern end.

The full programme
Public Works Department

Works under the Public Works Department

Civil and architectural works delivered directly for the Public Works Department, in government buildings that stay in use.

Proof of work

Signed off by the client, on paper

Every package is signed off by the engineer, and completed packages carry a work completion certificate from the client. Copies go out with any tender submission or on request.

2 Completion certificates 5 Registrations and licences All credentials
Who we are

Dhaka's public infrastructure, delivered to contractor standards

Alif Construction is a Dhaka civil construction company with more than seven years on site, enlisted on e-GP for Government of Bangladesh procurement. We deliver under Italian-Thai Development for DMTCL on MRT Line-6, and directly for the Public Works Department.

Our vision

To deliver every project with uncompromising quality, safety and integrity, building infrastructure that strengthens Bangladesh and stands the test of time.

Our mission

Deliver civil, renovation and architectural works to engineer approval, on live public sites, with one desk accountable.

Experience 7+ Years in civil construction
On the corridor 318 m Railing beside live traffic
Procurement e-GP GOB enlisted
MRT Line-6 2 Packages on the metro
Internationally financed and government tenders

Bids built to the standard the financier actually applies

Our focus is the Japanese ODA loan package, prepared on JICA's own bidding document. World Bank and ADB work follows their rated and merit point rules, and government tenders run through e-GP under the Public Procurement Rules 2025.

Tender support
JICA Lowest evaluated responsive bid Japanese ODA loans
World Bank Highest ranked bid Rated criteria
ADB Highest ranked bid Merit point criteria, from 2026
e-GP Lowest evaluated responsive tender Public Procurement Rules 2025
Photo and video

Emerging project highlights

Photographs and video from the packages currently on site and recently handed over.

Uttara North to Agargaon stretch MRT Line-6 corridor Work along the Uttara North to Agargaon stretch, beside live traffic.
Uttara North to Agargaon stretch Station platforms Platform works at the elevated stations.
Uttara North to Agargaon stretch Below the viaduct Footpaths and railings on the street below the line.
Kamalapur Station Kamalapur Station Works inside the southern terminus of Line-6.
Uttara North to Agargaon stretch Night works window Work scheduled into agreed low-traffic windows.
PWD Bhaban renovation PWD Bhaban renovation Renovation works at Segunbagicha, with the offices in use.
Area handback inspection Each zone inspected and signed off before the next one opens.
More in the gallery
How we deliver

What every package gets, without exception

The same three conditions apply whether the package is a station facade or a footpath.

01
Engineer-approved delivery Every material and method enters site through a reviewed submission under the engineer.
02
One accountable desk A lean engineering core answers directly for every package, from tender to handover.
03
Safety-inducted workforce Vetted crews scaled per package, inducted to the standards live public sites demand.
Commitment

What makes us different

Public infrastructure does not close for construction. Our work is organised around delivering while the city keeps moving.

Safety on live sites Inducted crews and controlled work zones beside operating traffic, stations and offices.
Everything on paper Materials, methods and revisions enter site through reviewed submissions under the engineer.
One desk, start to finish The office that signs the tender answers for the handover. No layers in between.

Seven years of packages delivered on live public sites, every one signed off by the engineer before handback.

Delivered for DMTCL on MRT Line-6 under Italian-Thai Development, and directly for the Public Works Department. Client references are available on request for tender submissions.

They delivered the glazing package to engineer approval while the station stayed a live public site. The paperwork was ready before we asked for it.
Engineer's representative · CP-03 & CP-04
The bhaban never closed for a day. Their crews worked around our office hours and handed over exactly what the drawings said.
Project lead · PWD Segunbagicha
Work inside the operating station was planned around passenger hours, and every area came back clean and signed off.
Engineer's representative · Kamalapur Station
Quick enquiry

Get a call back about your civil, glazing or renovation package

Required fields are marked *

Need documents, a subcontract or tender support? Use the full enquiry form