Railings & footpaths · 318 m
Uttara toward AgargaonAbout the project
318 metres of railings and footpaths along the MRT Line-6 corridor from Uttara toward Agargaon, built beside live traffic under Italian-Thai Development for DMTCL.
The work was sectioned so pedestrians never lost the route: each stretch was barriered, built, inspected and handed back before the next was taken.
What we provided
The scope delivered under this package.
Railing fabrication and installation: MS railings fabricated and installed along the corridor edge.
Footpaths: Sub-base to surface finish, laid in sections.
Traffic-side protection: Barriers and flag control agreed with the engineer, adjusted by time of day.
Reinstatement: Kerbs, surfaces and crossings returned to use behind each section.
How we delivered it
All 318 metres delivered with the corridor open throughout, section by section, under the engineer’s inspection.