Rain protection works at six operating stations, S02 through S07, on MRT Line-6: canopies and rain protection installed at entrances passengers were using the same day.
Elements were fabricated off-site and installed in agreed windows, so passenger flow continued around every fixing point.
What we provided
The scope delivered under this package.
Canopies and rain protection: Fabricated off-site, installed at operating station entrances.
Fixing details: Connections to station structure approved by the engineer before installation.
Window installation: Work scheduled into agreed low-traffic windows at each station.
As-built records: Every installed element documented for the station file.
How we delivered it
Six operating stations protected from rain with entrances in use throughout, delivered station by station to one approved standard.