Service

Architectural Glazing & Facade Solutions

Curtain wall, structural glazing, skylights, doors and windows, and ornamental facade finishes, measured, fabricated and installed to engineer approval.

  • 13 scope items
  • Delivered on Kamalapur Station
  • Engineer-approved submissions
About this service

What this covers

Glazing and facade work is the visible skin of a public building, and it is judged twice: once on how it looks and once on how it performs in wind and rain. Every panel and profile we install enters site through a reviewed submission, goes in to an approved shop drawing, and is signed off by the engineer before we call it done.

Our reference works are station packages on MRT Line-6, including the ongoing glazing at Kamalapur Station S17, the line's terminus. Installation there proceeds while the station remains a guarded, active site, so measurement, fabrication and lifting are sequenced around railway operations rather than the other way round.

The sequence matters more than the material. We measure on site rather than from the drawing alone, because a structure as built is never exactly the structure as drawn. Shop drawings follow the survey, fabrication follows approval of the shop drawings, and nothing is cut before its drawing is signed. That order is what keeps a facade package off the critical path.

A facade is designed twice over. The building frame is checked against one set of wind pressures, and the cladding against another, because a single panel sees a sharper local gust than the structure as a whole, and corners and edges sharper still. Dhaka's basic wind speed under the Bangladesh National Building Code 2020 is 65.7 metres per second, measured as a three second gust at ten metres. No panel or fixing we install is designed below the code minimum net pressure of half a kilonewton per square metre.

The seismic requirement is the one most often missed. Dhaka sits in Seismic Zone 2, and every building here falls into seismic design category C or D, never B. That matters because the code's exemption for architectural components applies only to category B. In Dhaka, cladding must be designed for seismic forces as a matter of code, not preference. Panel joints and connections have to absorb twice the storey drift or twelve millimetres, whichever is greater; connection bodies are designed for a third more force again, and the fasteners for four times it.

Two of the materials in a facade are not left to the specification in Bangladesh. Float glass and extruded aluminium profiles both sit on the mandatory certification list, against BDS 1832 and BDS 1879, so the material has to carry a certification mark before it is lawfully sold. We buy to those standards and keep the certificates, because on a public project they are asked for.

Case study

Delivered on this service

Kamalapur Station Kamalapur, Dhaka

The station stays guarded and in operation while the work advances, and every finished zone is signed off by the engineer before the next opens. Status: Ongoing.

Location Kamalapur, Dhaka Client chain DMTCL · Italian-Thai Development Work items Four, glazing to drainage
From the work

On site

How the work is run

The same four commitments on every package

Talk to us about this service
01 Safety on live sites

Inducted crews and controlled work zones beside operating traffic, stations and offices.

02 Everything on paper

Materials, methods and revisions enter site through reviewed submissions under the engineer.

03 One desk, start to finish

The office that signs the tender answers for the handover. No layers in between.

04 On-time handover

Programmed around the site’s own operating hours, so areas hand back when they are promised.

Work scope

What the work covers

  • Curtain wall and structural glazing: Aluminium and steel framed systems, measured on site, fabricated to approved shop drawings and installed to the specified tolerances.
  • Skylights and roof glazing: Overhead glazing assemblies including framing, safety glass, drainage and weathering details.
  • Doors and windows: Aluminium and steel door and window sets, including ironmongery, weather seals and commissioning.
  • Facade cladding and ornamental finishes: Composite panel, louvre and ornamental metalwork, fixed to a coordinated support system.
  • Survey and shop drawings: Site measurement before fabrication, with shop drawings submitted for approval and nothing fabricated ahead of that approval.
  • Submissions and material approvals: Glass, framing, sealant and fixing submissions with the supporting product data the engineer needs to review them.
  • Handover documentation: As-built drawings, system and workmanship warranties and maintenance information compiled into the handover file.
  • Certified glass and aluminium: Float glass to BDS 1832 and extruded aluminium profiles to BDS 1879, both under mandatory certification, with the paperwork held on file.
  • Finish thickness quoted to a number: Anodising at not less than fifteen microns, or powder coating at not less than twenty five microns, which is the threshold the public works rate schedule sets.
  • Wind and seismic design of the cladding: Components and cladding assessed separately from the main frame, with edge and corner zones and the connection movement capacity the code sets for Dhaka.
  • Deflection control: Aluminium members supporting a glass edge held to the code limits of L/175 for each lite and L/60 over the whole member, so glass is not loaded by a flexing frame.
  • Energy compliance: Glazing selected against the code's window to wall ratio and solar heat gain table, keeping visible light transmittance at or above the thirty five per cent floor.
  • Performance testing to specification: Air, water and structural testing arranged to whatever the project specification calls for. The national code sets no curtain wall test regime, so the contract governs and we work to it.
Questions

Popular questions

Can you install at an operating station?
Yes. The Kamalapur S17 glazing proceeds while the station operates, with work zones, access routes and lifting windows agreed in advance with the site team.
Do you produce shop drawings?
Yes. Site measurement and shop drawings precede fabrication, and nothing is fabricated before the drawing is approved. Working from the architectural drawing alone is how facade packages end up remade.
Which systems do you work with?
Aluminium and steel framed glazing, skylights, doors, windows, composite panel cladding and ornamental metalwork. Where a project specifies a proprietary system we work to that system's own fixing and warranty requirements.
What warranties do we receive?
System warranties from the manufacturer and a workmanship warranty from us, compiled into the handover dossier together with the as-built drawings.
What wind load do you design the facade to?
Dhaka's basic wind speed under BNBC 2020 is 65.7 metres per second, a three second gust at ten metres above ground with a fifty year return period. Cladding is not designed to the same pressures as the building frame: a small panel has a smaller effective wind area, which raises the local pressure coefficient, and panels at edges and corners are higher again. The code also sets an absolute floor of 0.5 kilonewtons per square metre net on any component.
Does the facade need to be designed for earthquake?
In Dhaka, yes. The city is in Seismic Zone 2 with a zone coefficient of 0.20, and every occupancy here falls in seismic design category C or D. The code exempts architectural components only in category B, so that exemption never reaches a Dhaka building. In practice it means the connections carry the requirement: joints must accommodate twice the storey drift or twelve millimetres, connection bodies are designed at 1.33 times the component force and the fasteners at four times it.
How do I know the aluminium and glass are up to standard?
On these two materials you are not relying on our word or on the specification. Extruded aluminium profiles and float glass are both under mandatory certification in Bangladesh, against BDS 1879 and BDS 1832, so certified stock is a legal requirement rather than an upgrade. On finishes we quote to the Public Works Department schedule, which sets anodising at not less than fifteen microns and powder coating at not less than twenty five microns. Those are numbers you can have checked on delivery, and we would rather be held to them than to an adjective.
Which glass standards do you work to?
The four the code adopts: ASTM C1036 for flat glass, ASTM C1048 for heat treated glass, and ANSI Z97.1 with CPSC 16 CFR Part 1201 for safety glazing performance. Worth knowing that BNBC 2020 adopts those performance standards but does not itself schedule where safety glazing is required or set thicknesses, so the specification decides that. We price what the specification asks for and say so plainly if it looks light for the exposure.
Start a conversation

Planning a package like this one?

Send the drawings or the tender notice. We reply fastest on WhatsApp, usually within the hour on working days.

  • Reply within the hour on working days
  • Drawings, BOQ or tender notice welcome
  • Company profile and certificates on request