Service

Construction

Civil works on live public corridors: footpaths, pavements, railings, drainage and rain protection, built while the road stays open.

  • 6 scope items
  • Delivered on Uttara North to Agargaon stretch
  • Engineer-approved submissions
About this service

What this covers

Our civil crews build the parts of Dhaka people use before they ever enter a building: footpaths, pavements, railings and rain protection along corridors that stay open while we work. Work zones are planned around live traffic and pedestrians, and agreed with the engineer before the first barrier goes up.

The package that made our name is street level work on the MRT Line-6 corridor, delivered under Italian-Thai Development for DMTCL. Between Uttara and Agargaon we built 318 metres of railing and footpath beside moving traffic. The same discipline of approved materials, controlled zones and daily site records now runs through every civil package we price.

Street level work has a particular difficulty that building sites do not. The public is inside the work area, not outside it. Lane closures, pedestrian diversions and lifting windows are agreed in advance and adjusted by time of day, and each length is handed back in use before the next is opened up. That is what keeps a corridor moving while it is being rebuilt.

From the work

On site

How the work is run

The same four commitments on every package

Talk to us about this service
01 Safety on live sites

Inducted crews and controlled work zones beside operating traffic, stations and offices.

02 Everything on paper

Materials, methods and revisions enter site through reviewed submissions under the engineer.

03 One desk, start to finish

The office that signs the tender answers for the handover. No layers in between.

04 On-time handover

Programmed around the site’s own operating hours, so areas hand back when they are promised.

Work scope

What the work covers

  • Footpaths and pavements: Sub-base, kerbing, surfacing and reinstatement, set out to the approved levels and profiles.
  • Railings and guardrails: Fabrication and installation of pedestrian and traffic railings, galvanised and finished to the approved specification.
  • Rain protection and covered walkways: Canopy structures and covered links at stations and public buildings, installed around operating hours.
  • Surface drainage: Channels, gullies and connections set to fall, tested before the surface goes back.
  • Traffic management and work zones: Barriers, diversions, signage and flag control agreed with the engineer and the authority before work starts.
  • Reinstatement and handback: Each length cleaned, inspected and signed off before it reopens, with the records to show it.
Questions

Popular questions

Can you work beside live traffic?
Yes. Work zones, barriers and flag control are agreed with the engineer and adjusted by time of day, so traffic and pedestrians keep moving while the work proceeds. The 318 metres of railing and footpath between Uttara and Agargaon was built this way.
Who approves the materials?
The engineer. Every material enters site through a reviewed submission before it is used in the work, and nothing is ordered against an unapproved submission.
How is safety managed on site?
Inducted crews, PPE control and a named safety lead for each work zone, with daily site records. On a public corridor the safety case covers the public as much as the workforce.
What size of package do you take on?
From a few hundred metres of railing to a full corridor package. The 318 metre railing and footpath works between Uttara and Agargaon is a typical reference.
Start a conversation

Planning a package like this one?

Send the drawings or the tender notice. We reply fastest on WhatsApp, usually within the hour on working days.

  • Reply within the hour on working days
  • Drawings, BOQ or tender notice welcome
  • Company profile and certificates on request